Tuesday, July 19, 2011

And, it's official,

I am totally screwed. In spite of diligent efforts, knitting monogomy (not even tempted on this project, I swear, totally faithful to the shawl), carrying it around with me EVERYWHERE in case I will have an unexpected few minutes, staying up entirely too late some evenings (especially considering that my littlest guy is STILL not consistently sleeping all the way through the night), and measuring entirely too often, I am officially behind schedule.


According to the schedule, I was supposed to have reached the center spine by now, and started the decreasing rows.


A digression to explain the shawl's construction. It is worked side to side. So I start on the right side with only a few stitches, then increase one stitch every fourth row. When I reach the midpoint, I start decreasing every fourth row, until I am back down to the original few stitches. Then I add the suicide ruffle.


Right now, it is hard (Ok, impossible) to stick to the schedule, because the rows keeping getting wider, so it takes longer to complete them. The decrease rows will have the opposite effect, so I will start accelerating my progress.


Right now, each row takes about 6 minutes to complete. That may not sound like much, but the schedule calls for 24 rows per day. That is 2 1/2 hours per day. I am not knitting 2 1/2 hours per day, which means that I am falling ever further behind with each new day.


But all hope is not yet lost! There is the decreasing acceleration factor to consider on the later stages of the shawl. And I may have completely overestimated the time requirements of the suicide ruffle. (Really, I MAY have.)


So far, I am 16 3/4 wide. (The shawl, that is, not me personally.) The pattern calls for 20 to 24 inches wide. Kate is about half a foot taller than me, so I calculating that I am on the shorter end of the desired width. (I am at the shorter end of everything else, so it would be a cruel irony not to be short when I really need it.)


Plus, there is a round trip drive to Chicago this week (picking up my brother et al from O'Hare) and Mom will be doing most of the driving. Lots of knitting opportunity. I am primarily going for company and to serve as navigator.


And in the worst case scenario, failure to finish by September 15th only means that I will not be considered for the knit-along's judging. I will still have a lovely shawl, no matter when I finish it.


Today, it is all about the optimism. (Or delusion. I write, you decide.)

No comments: