After a month of all Aurora all the time, I am slowly returning to my usual knitting multi-tasking. I worked on a sock a little at the office. I finished the heel and started on the foot. The Unnamed Red Sock. That doesn't really work, does it? I am halfway through the second sock, and never named it? Lacey in Red. Good enough.
I worked on Pretty in Pink at home. Almost through the second needle, on the second to the last row before bind off. I measured the cone, last night, and this yarn-sucking ruffle used about 1/2 inch off the cone. I still have 1 3/4 inches left. Plenty to make something else with it. Must think on that.
I didn't pick up Fuchsia Wave, but her time is coming soon.
I am sorely tempted to start in on Jane shawl, but I am not giving in to that temptation, until I finish two other nearly finished projects. In my post-Duchess high, I really did go overboard with a full-on case of startitis, and it is time to reign in. My work in progress bag runneth over.
I could not bring myself to rip out Aurora. I was too tired to concentrate last night, and ripping out inches will probably require a glass or two of wine as anesthesia. For me, not the shawl.
Today, it is all about the Finish-itis.
1 year ago
No comments:
Post a Comment