I am very concerned about the yarn for the tank top. I have four balls of Grass. I received those balls in a yarn exchange, so there is no hope of finding more. I mean, really, the emergency yarn from Poland was a once in a lifetime fluke.
So I have started knitting the Shapely Tank, but even as I cast on, I don't think that I will have enough yarn. At least, I won't have to knit all of it, only to come up short with only a few inches to go. Again. Four balls, two sides. If I haven't completed the front with two balls, all hope is lost.
I am so pessimistic, I already have a contingency plan. 2 and 1/2 inches, and I have a back-up plan. Still a tank top, just a little skimpier. And knit the bra portion first, then the body top down, in the round. I can knit until I run out of yarn.
Today, it is all about Plan B.
1 year ago
No comments:
Post a Comment