Showing posts with label Crayon Toddler Sweater. Show all posts
Showing posts with label Crayon Toddler Sweater. Show all posts

Sunday, August 5, 2007

Back on track

I finished the toddler sweater. Had some yarn leftover, so I decided to make a hat. Then I was afraid that the hat was too big, so used the final bit of leftover yarn to make a second hat. And gave to the intended toddler the day after her birthday, when we next saw her parents. Everyone ooo'd and ahhh's appropriately, and it appeared that the sweater would be the perfect size for her around the time that it was cold enough to wear it. And I forgot to take a picture. My humble apologies. All permanent record of this adorable sweater set is lost forever. Mea cupla.



I am nearly finished with the gray shawl. Halfway through casting off the few thousand little stitches at the top. A nice stretchy and mindless bind off. I love the way that the yarn drapes and feels. Except. . . . .I screwed up. In my defense the directions mentioned the side border, and head a special section labeled "BORDER", which I thought was the same. Several other triangular shwal patterns I had looked at added the side border at the end, after the body section was complete. So, it was not completely unreasonable for me to think that is what the "border" section was, right? Well, it turned out that the notes for what to add on to the sides were mentioned in the notes of the directions, and the "Border" instructions only covered the top border. That left only one row of little loops instead of three. So I made the adjustment on the top to match the sides, and continued on. EXCEPT. . . . I forgot about the curling nature of stockinette. One row of the border may not be enough to flatten it out. This may block out, but as I have limited experience with blocking (Ok, none), I am not optomistic. The yarn is from Poland, so I have no idea what the content is. Time will tell, I guess, but it makes my first shawl attempt a lukewarm victory.



In other news, I am back on track with the Pomotomus sock. Not only have I worked past the little glitch, but I think I can now recognize an error as it happens and correct as I go. I am really loving this sock, even it it takes a tad more concentration than my previous socks.

My sweetie is out on the bike today. Hooters was hosting a parade of bikes and bikini contest. That sounded like a ride that would be better done with his buddy than with me. I am staying home and knitting. Don't worry dear, I will have dinner ready for you when you are finished gawking at silicon-filled bikinis.

Today it is all about the little victories.

Friday, July 6, 2007

Instant Gratification



I have been knitting with microscopicly thin sock yarn for so long, I have forgotten about the instant gratification found in chunky yarn. Just a few days ago, this was little skeins of yarn. Now look at it. Two mere sleeves away from a toddler sweater. And I was chiding myself for starting this a mere couple weeks before a 1st birthday party. Two days of knitting. 4 rows to the inch. Take that, knitting deadline!
And while I was digging around in the stash anyway, I also unearthed a sweater for myself. This one has been in progress for a couple years, I think. All it needs is sleeves, which I have started and ripped out several times. I loved the colors and texture in this yarn, so didn't want any kind of pattern to compete with it. So I just wanted a classic sweater, which I couldn't find. So with the hubris that only an advanced beginning knitter can understand, I took an existing sweater, put it on Lizzie (my dressmaker's dummie), and used it for a model, shaping as I went. All good, until I got to the sleeves, which giddy from my successes I decided to do top down, set-in sleeves, before I even knew how to do short-rows, mind you.
Well, the good news is that I THINK (famous last works) I have finally found the correct formula to pick up and decrease for fitted set-in sleeves. Now I just have to keep decreasing appropriately, and create the twin sleeve, which would require remembering what I did the first time. I am bound to get it right eventually, right?
Socks? Shawl? I don't know what you mean. I don't remember any socks.
Today it is all about the sleeves.

Wednesday, July 4, 2007

Happy Birthday America!!!

The mid-week celebration of the 4th is somewhat of a bummer. Both of us have to work early tomorrow morning, so staying up late enough for fireworks isn't as easy as it sounds. It doesn't get dark until nearly 10, and then there is the show, and the traffic getting out. . . . 6 am comes pretty early, and my sweetie has to be at work before then. Poor lamb.

I am still stalled on my dove gray shawl and Pomotomus sock. Not that I think the problems are unsolvable. I sure it is just a matter of looking hard at my stitche patterns, count a few times, and make a relatively simple correction. I just haven't sat down to do it yet. I will. I love the Pomotomus sock, and just the other day my sweetie stroked the shawl and commented on how soft it is. (I have a mental picture involving the shawl and. . . . well, the rest doesn't need to be posted for public consumption. We ARE newlyweds. Suffice to say I just came up with new motivation to work on that shawl.)


For now, my solution to these stalled projects. . . is to start something new, of course. I started on the socks for my mother. I was thinking about doing some rear increases up the leg, to custom fit my mom's ankle and calf. Something fancy, but nooooooo. Mom wants plain boring socks with a cuff that can fold down. I tried to convince her of the magic of hand knit socks made to your dimensions, but I am amking what Mom wants. It is a little frustrating that an artist must defer to the purchaser. But I do want Mom to feel comfortable and wear these socks, so I defer. Maybe the next pair.

As a break from itty bitty sock yarn and needles, I also started this: a toddler's sweater. I realized that a friend of ours has a baby turning one at the end of the month. I haven't knit anything for her since she was born. How time sneaks up on you! So I started a sweater, hoping to get it done in time. I had forgotten how quickly size 10 needles moves along. Look at that! Halfway through the body in one night! Still on my first ball of yarn, too. I have 5 (found in the clearance bin), so I will probably have enough to make a second toddler's sweater in the future.

And lest anyone thinks that my sweetie has been slacking. . . The shed is starting to close in on itself. Back siding, and studs on the top triangle near the roof (I am sure that area has some sort of a name), so that can get siding too. He keeps talking about getting the roof plywood "soon", whenever that is.
I just noticed that no one (read: me) has made the bed yet, and I am just itching to fly along more on that little sweater.
Today, it is all about the patriotic birthday.