Showing posts with label Un-named Red Sock. Show all posts
Showing posts with label Un-named Red Sock. Show all posts

Tuesday, July 9, 2013

The Usual Suspects

After a month of all Aurora all the time, I am slowly returning to my usual knitting multi-tasking.  I worked on a sock a little at the office.  I finished the heel and started on the foot.  The Unnamed Red Sock.  That doesn't really work, does it?  I am halfway through the second sock, and never named it?  Lacey in Red.  Good enough.   

I worked on Pretty in Pink at home. Almost through the second needle, on the second to the last row before bind off.  I measured the cone, last night, and this yarn-sucking ruffle used about 1/2 inch off the cone.  I still have 1 3/4 inches left.  Plenty to make something else with it.  Must think on that. 

I didn't pick up Fuchsia Wave, but her time is coming soon. 

I am sorely tempted to start in on Jane shawl, but I am not giving in to that temptation, until I finish two other nearly finished projects.  In my post-Duchess high, I really did go overboard with a full-on case of startitis, and it is time to reign in.  My work in progress bag runneth over.

I could not bring myself to rip out Aurora.  I was too tired to concentrate last night, and ripping out inches will probably require a glass or two of wine as anesthesia.  For me, not the shawl. 

Today, it is all about the Finish-itis.         

Sunday, January 16, 2011

Fast Gratification

I have been working here and there on my Twisted Tween Socks and Unnamed Red Socks, not enough for progress to be noticeable to anyone but me.

Plus, I have been stitching Monet. Around 750 stitches completed so far. 107,250 to go. I can't figure out how Monet painted the original without going blurry-eyed. All those tiny bits of blues, lavender and gray.

I took a trip to the yarn store yesterday, gift certificate clutched in my hand, ready to indulge my fiber cravings. Except that, while my knitting time has increased lately, it is far less than it was five years ago in my single days. I didn't expect it to affect my yarn buying mind, but it did. Everything I saw, I found myself comparing to the yarns in my stash. I have so many wonderful yarns in my stash, waiting to be knit, I found myself only wanting to buy what was nicer than what was in my stash. I only found one thing. Well, three skeins of the same thing. I left with one gift certificate still unspent. I figure I will bring it to Knit Night, and use it on something that catches my fancy after two hours of child-free knitting time.
So I started something new. Something in worsted weight. Something with speedy knit gratification. I started this yesterday, and already have noticeable progress. I have progress since the picture was taken earlier this afternoon. I am making some convertible hunting mittens for my sweetie. He is showing admirable patience as I measure his hands, and ask questions about how high he wants the cuffs to go up his forearms.
Today, it is all about the speed.

Wednesday, January 5, 2011

Blues

My sweetie had minor surgery right before Christmas. We planned it that way, to maximize the holiday pay and shutdowns for as much of his required time off. Which meant that I spend two weeks at home with him. He was supposed to be taking it easy, so the first two days were spent taking care of him, and the remaining 12 days were spent contemplating chaining him to the chair so he would take it easy.

The kids went to Grandmas' houses as usual, to limit noise and blood pressure. I worked from home, and went in to the office for half days here and there, but mostly, I was at home doing home things. Laundry, cleaning, and relaxing. A sort of mental health recovery for me during my sweetie's physical recovery.

I did a little knitting, but not enough to photograph. Same two pairs of socks I have been working on for a long time. Twisted Tweed and Un-named red socks.


I also started something new. There are these cross-stitch patterns that I have been drooling over for years. Reproductions of Monet paintings. My mother got me four of them for Christmas. Considering how large and intricate the patterns are, I think this may be enough for a lifetime.
I started the first one. "Red Waterlilies" The directions are a little different. They recommend working a 10 by 10 stitch square at a time. Sometimes I am only doing a few squares of a color. Start, stitch three squares, end. Sounds crazy, but you would never be able to keep track of what you have stitched otherwise.
There are too many slightly different colors. Right now, all I have done is blues. Sky blues, periwinkle blue, cornflower blue, blue violet, delft blue, antique blue, wedgewood blue. . . .Blues, blues, blues. (The unstitched squares you see is the medium light blue violet that I missed on the list to buy.)
Mind-numbing, but in a good way. I have finished five squares on the first page. There are about 40 squares on each page. There are 30 pages. That makes. . . . roughly 1200 squares. Someone please tell me that my math is incorrect. That is a lot of blues. Sure, there is some greens for the lilipads, and pinks/reds for the flowers. Some lavenders and grays for accent, but still a lot of blue.
Today, it is all about the blues.