Showing posts with label Aurora Borealis shawl. Show all posts
Showing posts with label Aurora Borealis shawl. Show all posts

Tuesday, July 16, 2013

Reduction


Last night was Knitter-vention.  I showed off my too-long shawl, and turned a deaf ear to all observations that while the shawl was too long for my petite frame, it was the perfect size for [fill in the blank of a taller knitter]. 

Hand's off, ladies, this is an easy fix. 

Armed with a pint of Magners, I girded my loins, and prepared to rip out two feet of knitting. 

It took a while, but finally I was ready to re-bind off.  If I had brought the needles, that is.  Theresa came to my rescue (thanks again for the loaner!), and before long, I had a perfectly-sized shawl.   

Ta da!  Isn't it lovely?

The yarn did soften after its bath, and I can't wait for cooler evenings so I can take it out and play with it. 

The pattern was almost laughably easy, though appears to be more complex. 

All in all, I am very pleased. 

And I still have 2+ balls of Noro left.  What to do?

How much longer do you think my boys will get so excited to pose with knitting? 

I worked on Lacey in Red the rest of the night.  A socks whose time has come to finish.  I would have to check to be certain, but I am pretty sure that I started this sock when Bugaboo was a baby. He turns 5 next week.  That is just shameful. 

I AM halfway through the foot on the second sock, but still . . . .absolutely disgraceful. 

Today, it is all about the disgrace. 

Tuesday, July 9, 2013

The Usual Suspects

After a month of all Aurora all the time, I am slowly returning to my usual knitting multi-tasking.  I worked on a sock a little at the office.  I finished the heel and started on the foot.  The Unnamed Red Sock.  That doesn't really work, does it?  I am halfway through the second sock, and never named it?  Lacey in Red.  Good enough.   

I worked on Pretty in Pink at home. Almost through the second needle, on the second to the last row before bind off.  I measured the cone, last night, and this yarn-sucking ruffle used about 1/2 inch off the cone.  I still have 1 3/4 inches left.  Plenty to make something else with it.  Must think on that. 

I didn't pick up Fuchsia Wave, but her time is coming soon. 

I am sorely tempted to start in on Jane shawl, but I am not giving in to that temptation, until I finish two other nearly finished projects.  In my post-Duchess high, I really did go overboard with a full-on case of startitis, and it is time to reign in.  My work in progress bag runneth over.

I could not bring myself to rip out Aurora.  I was too tired to concentrate last night, and ripping out inches will probably require a glass or two of wine as anesthesia.  For me, not the shawl. 

Today, it is all about the Finish-itis.         

Monday, July 8, 2013

Good news, Bad news

The bad news is . . .  that yarn has lost it's magical qualities.  I outed it.  I exposed its magic to the world wide web, and the government men in monochromatic suits came and swapped the yarn.  Or maybe it was old wizards in long robes.  I can't say, my memory was swiped clean in the process.  I never had a magic ball of yarn.  It was ordinary all along. 

The good news is . . . I finished my Aurora Borealis shawl.  I wass so excited, I gave it a bath and blocked it within 12 hours of binding off. 

The bad news. . . . after blocking, I have to accept a harsh reality.  At 8 1/2 feet, it is really too long.    Either that, or I am too short.  (Bloody hell, it is Duchess all over again.)  I can't do anything about my petite stature, but I can do something about my apparent inability to remember that I am not 5 foot 8 inches.  Not in time for this shawl, of course, but I do have a solution. 

The bad news is . .  I am going to rip out and re-bind off.  It will be painful, but it really will be the best thing for the shawl.  I don't want to worry about dragging edges every time I wear the thing. 

The good news is. . . I will have a ball or two of Noro left over to make something else.  After I get over the trauma, that is. 

Today, it is all about the good, the bad, and the beautiful. 


Monday, July 1, 2013

Indulgences

Yesterday was shorter than I anticipated.  Not the whole day, of course.  The day was still 24 hours as usual, but my alone portion of the day was only five hours.  Still, five hours is more free time than I ever see at once, so I wasn't going to quibble. 

I built myself a little nest:  a cocktail ( I don't normally imbibe in the afternoon, but this was a special occasion), a bowl of Doritoes (not on my diet these days, but again, special occasion), my Aurora Borealis shawl, my cross-stitch, and my remote control. 

I only had time to watch the unaired pilot and first season.  Well, most of the first season.  I didn't quite finish episode 3.  I can't speak for Benedict Cumberbatch, but I enjoyed myself. 

Since I had neglected it for years, I started working on my Monet Waterlilies cross stitch.  It is incredibly intricate and challenging.  You only work one 10 by 10 block at a time, and those 100 stitches are difficult enough.  The colors are almost imperceptibly different from each other, so you really can't tell what you have done and what you haven't, except on a stitch by stitch basis.  I completed one block (only 7 by 10, it was on the edge of the page), and started another, before I started needing colors that I hadn't bought yet.  So far, I had only been working on a great big patch of mottled blue, with the occasional swirl of gray or lavender.  But I can come to the first rock/lilypad, and hadn't bought any of those colors yet. 

I thought that I had made a healthy re-start on the stitching, and moved onto Aurora.  I cranked out another ball of yarn on that shawl, before I heard the joyous peals of my children's return. 

Tonight is Knitter-vention, and I am very close to the last ball of yarn for the shawl.  I will no doubt start that last ball tonight, though finishing it may be overly ambitious.  I was only joking when I wrote it last week, but his shawl may really be finished by the 4th of July. 

Which leads me to the need for an apology.  Last week, I wished for a cold snap over the holiday, so I could wear the shawl.  And now, the entire midwest is experiencing temperatures 15 degrees below normal.  No swimming this weekend, I was too busy pulling out hoodies for the boys.  Brrr.  I apologize to the entire midwest for my thoughtless and selfish wish, and humbly request the return of summer.  I understand that Arizona has heat to spare. 

Today, it is all about humility

Tuesday, June 25, 2013

Wraparound


The Aurora Borealis shawl is still growing at a rate that defies all the usual laws of knitting output.

I am approximately 75% finished.  

It is long enough to wrap around my shoulders completely.  

It is taller than I.

It is long enough to cover a large loveseat.

It is large enough to serve as a backdrop for two very cute little boys.  

Today, it is all about knitting against the rules.   

Friday, June 21, 2013

High as an Elephant's Eye by the 4th of July

4 feet, 4 inches.  I love it when a knitted item can be measured in feet.  As this marks the close of the 4th week in progress, that is over a foot per week.  Not to shabby.   At this rate, I will be finished in three weeks or so.  
I find myself wishing for a little cold snap for the 4th of July, just so I could throw some sparkly silk around my shoulders.    

And, at long last, I have finally named the Noro shawl:  Aurora Borealis shawl.  The yarn is Noro Aurora.  The colors remind me of the northern lights.  The little sparklies a reminiscent of stars in the night sky.  The name is almost too obvious for me to have taken four weeks to think up.  

Today, it is all about the christening cermony.